HomeResourcesOur CasesChina 1.04MWh C&I Energy Storage Project
China 1.04MWh C&I Energy Storage Project

Delivered in: MAY 2025

Thermal Management: Liquid cooling

Dual switch-rooms, independently isolated, seamlessly synchronized.

One project. Dual switch-rooms, independently isolated, seamlessly synchronized.

Our Cases
Storage Closed The Demand Gap for Metal Factory
Daytime demand was outgrowing the transformer - storage closed the gap, without the wait.
READ CASE STUDY
Products
125kW/261kWh ESS
Ideal for most of the C&I scenarios. Easy installation by Modular design & Liquid-cooled system. Backed with Multi-level fire protection & Long-life LFP battery.
LEARN MORE