Case: 3MW/6.26MWh Solar + BESS Project for Industrial Park
Delivered in: 2024
How Customer Benefit
By deploying 24 units of 125kW/261kWh ESS (CATL battery cells) , the industrial park obtained an estimated ROI at four-and-a-half years.
Reduced costs and Improved efficiency.
Ensured a stable power supply for production. Achieved 30% reduction overall in electricity bills, generating Annual Savings of around $195,000.
Customer Pain Point
High energy costs – monthly consumption of ~850,000 kWh
Production losses – up to $14,000 per hour during unplanned outages
HELZ solution
Peak shaving and valley filling + Emergency Backup Power. 1 Cycle per day: Charged at night and Discharged (used for loads) during daytime / working hours.
For this project, client chose CATL. REPT BATTERO battery cells are used by default.
Further tailored requirements are feasible when provided the design is reasonable and the project operates safely and in compliance with regulations.
HELZ takes charge every of your project:
Site survey
Analysis of existing electricity bills
Feasibility assessment
Production and Construction supports the project
Grid connection and commissioning
After-sales O&M.