HomeResourcesOur CasesRepeated Orders | 8.8 MWh | 1 Client
Repeated Orders | 8.8 MWh | 1 Client

Client's Industry: Grand Industrial Park

Solution: Peak Shaving, Peak-Valley Arbitrage

Delivered in: MAY to NOV 2025

 


 

 

Tackle the challenges with HELZ products

 

When the park plant approached us in early 2024, their challenge was straight-forward but urgent.

Rising electricity costs had been eating into their margins.

The customer requested more power, but they needed it economically.

 


 

$300k saved. Repeated orders. 53 cabinets installed 

 

10 cabinets equipped with intelligent EMS (energy management system) were put into use and began its first commercial operation in May 2024.

The energy storage plant cut its grid electricity purchases during peak windows, and shaved fees off their quarterly bill.

The EMS platform automated charge-discharge cycles without requiring onsite staff intervention, and it showed directly to the customer how much the revenue generated after deployment.

 

By quarter-end, the customer started to consider expansion.

 

The Project Expanded

The park moved from pilot to program.

By mid-2026, they had placed their fifth order.

Today, the site operates 53 HELZ energy storage cabinets in total.

The annual electricity bill savings are computed to exceed $300k idealy.

 


 

HELZ is looking for Global Partners

If you are in PV EPC, PV Installation, Renewable Utilities Distribution, you are more than welcome to contact us via WhatsApp call or by Email.

Every product delivered, is backed by experience.

  • Feasibility Assessment

  • Bill Analysis & Project Sizing

  • Pre-shipment Commissioning

  • Installation Support Service

  • O&M Services

Our Cases
3MW/6.26MWh Solar + BESS Project for Industrial Park
The solution enabled a 30% decrease in electricity costs, equivalent to over $195,000 in annual savings, alongside enhanced energy efficiency and production grade power reliability.
READ CASE STUDY
Storage Closed The Demand Gap for Metal Factory
Daytime demand was outgrowing the transformer - storage closed the gap, without the wait.
READ CASE STUDY
Products
125kW/261kWh ESS
Ideal for most of the C&I scenarios. Easy installation by Modular design & Liquid-cooled system. Backed with Multi-level fire protection & Long-life LFP battery.
LEARN MORE
104~261kWh PV-Diesel ESS
Ideal for Micro-grid projects. It offers wide power compatibility, comprehensive scene coverage and low after-sales maintenance risks.
LEARN MORE