Storage Closed The Demand Gap for Metal Factory

Case: Storage Closed The Demand Gap for Metal Factory
Delivered in: AUG 28 2025
How Customer Benefit
The factory expanded apacity with lower expenditure, shorter waiting time, thereby enabled passing those savings straight to their bottom line.
Customer Pain Point
The customer's transformer capacity fell short of demand - and a new transformer would have required a minimum of six months to audit and install.
HELZ solution
HELZ deployed its Dynamic Expansion feature.
The battery storage system was configured to discharge into the load from the start of working hours (8:00 AM) until its preset capacity was fully utilized.
Effectively supplementing the transformer's output exactly when the factory needed it most.
Recommended Product Series:
Liquid-cooled series—proven efficiency, mature technology, and cost-competitive pricing.
Our Cases

MWh Battery Storage for Energy-intensive Factory
Customer obtained lower reliance on the grid and saved around $180,000 from the bill annually.
READ CASE STUDY
3MW/6.26MWh Solar + BESS Project for Industrial Park
The solution enabled a 30% decrease in electricity costs, equivalent to over $195,000 in annual savings, alongside enhanced energy efficiency and production grade power reliability.
READ CASE STUDYProducts

125kW/261kWh ESS
Ideal for most of the C&I scenarios. Easy installation by Modular design & Liquid-cooled system. Backed with Multi-level fire protection & Long-life LFP battery.
LEARN MORE
32~48kW/64~96kWh PV-Diesel ESS
Compact design and modular model ideal for small-size commercial projects.
LEARN MORE